PRODUCT COMPARISON · APPLIANCE ASSEMBLY

One fan order.
How far can you trace it?

When a customer calls, sales needs the outstanding quantity and planning needs the operation holding up assembly. The baseline here is an ERP configured for purchasing, inventory, sales and finance. If your ERP also includes MES or APS, compare the same records in your own system.

Role task workspace

TRANSACTION-FOCUSED ERP

Check delivery against the order

Sales checks quantities ordered and shipped against the agreed date. Warehouse checks finished stock and the dispatch note.

Records to inspect: sales order, stock balance and dispatch note

AAVA DIGITAL FACTORY

Trace the delay to an operation

The planner asks local AI why assembly will not fit. Its answer links to the schedule, the operation’s reservation and the recorded constraint.

Inspect the test order: 292 minutes over capacity →

PRODUCTION PLANNING · TEST ORDER

Why won’t this
assembly job fit?

The planner asks AAVA to explain the block. Assembly needs 772 minutes against 480 available in the shift, leaving a 292-minute shortfall.

Sample verified on 23 Nov 2026 in the isolated PMC workbench, orders MO-20261123-000001 and 000002. The figures measure shift capacity. Delivery promises and the effect on other customers require separate analysis.

Compare the two work orders →
Request a demo with my work order ↗

Assembly centre · Plan review

Test workbench · Chinese UI
Required772
Available480
Overload (min)292
Inspect the blocked operation
Original scheduling result for the blocked assembly operation
Chinese label “本工序排程结果” means “Scheduling result”. No slot was reserved. The original plan records insufficient equipment, shift time or qualified staff within the window.
Compare the booked operation
Reserved slot for the other assembly operation
Chinese label “本工序预约” means “Operation reservation”. Another work order in the same plan has a reservation from 08:00 to 08:11. The planner can inspect each result before making a change.

Follow the order onto the floor

Shop-floor reporting

Which operation has the order reached?

Transaction-focused ERP

Check materials issued, completed quantities and receipts.

AAVA

The team opens the operation to check start conditions, reported quantities and the reason for a pause before resuming work.

See the operation workflow
Box tracing

Which box moved out of the original bin?

Transaction-focused ERP

Check stock by recorded item, lot and bin, then verify the quantity transferred.

AAVA

Scan the box to see its current bin and balance. Follow its handover to the transfer line or, for a supplier return, to the original receipt.

Follow a two-box transfer
Local AI and calls

Who was notified when the line stopped?

Transaction-focused ERP

The supervisor checks open orders and inventory, then contacts the floor to confirm the impact.

AAVA

When an alert matches a rule, configured phone and email channels can reach the person on duty. The supervisor can check delivery receipts and the person’s response separately.

Follow an alert through restart
3D and role workspaces

Where does a team lead open the task?

Transaction-focused ERP

Look up the relevant document by menu or number.

AAVA

Locate the task through the workshop in the 3D campus or open it from the role worklist. Both routes use the same records, permissions and workflows.

Explore 3D navigation

See your workflow in a demo

Start with one role, one transaction and one question.

Request a demo

Compare four approaches with one order

The table lists records to request during a walkthrough. Availability depends on the product, enabled modules and implementation scope.

What to testInventory and finance ERPShop-floor reportingIntegrated ERP and MES productsAAVA
Delivery enquiryCheck orders, shipments and receivablesInspect operation reportsVerify the order-line to work-order mappingFollow the sales line to signed receipts, then inspect station load and bookings
Rush order on a shared lineCheck open orders and inbound supplyCheck units reported by the shiftCompare shift, resource and freeze rules across systemsCompare required and available minutes in the same shift and open the blocked operation
Quality and receiptReconcile receipts and stockRead accepted and scrapped quantitiesTest whether inspection release constrains receiptUse a ten-unit order with eight released and check receipt and replacement quantities
Cost and closeReconcile journals, open items and inventoryInspect material and time entriesReconcile cross-system references, reversals and retriesReconcile finished goods, remaining WIP and scrap loss against the work order
Night-shift alertsLocate the duty contactInspect the stop reportTrace event routing and acknowledgementTest configured internal extensions and the acknowledgement trail
Data location and accessCheck hosting and finance permissionsCheck terminal accessInspect both applications and integration credentialsAsk two roles about one record and verify their permitted scope on premises
Implementation effortPrepare accounts and opening balancesPrepare operations, shifts and terminalsRehearse interface retries, cutover and reconciliationBring opening stock and two open orders and reconcile with warehouse and finance

Selection and deployment

Compare four approaches with one order, then review concurrent roles, scanners and opening data.