Choosing and deploying software for an assembly factory

Bring a split-delivery order, its bill of materials and a released receipt. Following the same batch makes the handovers between sales, planning, warehouse and finance visible.

Compare four approaches with one order

The table lists records to request during a walkthrough. Availability depends on the product, enabled modules and implementation scope.

What to testInventory and finance ERPShop-floor reportingIntegrated ERP and MES productsAAVA
Delivery enquiryCheck orders, shipments and receivablesInspect operation reportsVerify the order-line to work-order mappingFollow the sales line to signed receipts, then inspect station load and bookings
Rush order on a shared lineCheck open orders and inbound supplyCheck units reported by the shiftCompare shift, resource and freeze rules across systemsCompare required and available minutes in the same shift and open the blocked operation
Quality and receiptReconcile receipts and stockRead accepted and scrapped quantitiesTest whether inspection release constrains receiptUse a ten-unit order with eight released and check receipt and replacement quantities
Cost and closeReconcile journals, open items and inventoryInspect material and time entriesReconcile cross-system references, reversals and retriesReconcile finished goods, remaining WIP and scrap loss against the work order
Night-shift alertsLocate the duty contactInspect the stop reportTrace event routing and acknowledgementTest configured internal extensions and the acknowledgement trail
Data location and accessCheck hosting and finance permissionsCheck terminal accessInspect both applications and integration credentialsAsk two roles about one record and verify their permitted scope on premises
Implementation effortPrepare accounts and opening balancesPrepare operations, shifts and terminalsRehearse interface retries, cutover and reconciliationBring opening stock and two open orders and reconcile with warehouse and finance

On-premises deployment and cutover

  1. Choose a workflow

    For a fan order, agree which records supply the due date, production date, released quantity and accounting cut-off.

  2. Size the installation

    One reference machine runs a quantized 9B model with 16 GB of GPU memory and CPU offload. Connect tablets, scanners and IP phones over the factory LAN. List simultaneous users and voice channels. Run the candidate model at peak concurrency before selecting server memory, GPU and network capacity.

  3. Prepare opening data

    Separate opening stock, unfulfilled sales and open purchase quantities. Identify fulfilled and cancelled amounts. Have warehouse and finance reconcile each batch to its original records.

  4. Rehearse with each role

    Have each role use its own account. Rehearse a partial receipt or reversal, reconcile stock and ledger movements, then agree the cutover date.

Evidence to inspect