Choosing and deploying software for an assembly factory
Bring a split-delivery order, its bill of materials and a released receipt. Following the same batch makes the handovers between sales, planning, warehouse and finance visible.
Compare four approaches with one order
The table lists records to request during a walkthrough. Availability depends on the product, enabled modules and implementation scope.
| What to test | Inventory and finance ERP | Shop-floor reporting | Integrated ERP and MES products | AAVA |
|---|---|---|---|---|
| Delivery enquiry | Check orders, shipments and receivables | Inspect operation reports | Verify the order-line to work-order mapping | Follow the sales line to signed receipts, then inspect station load and bookings |
| Rush order on a shared line | Check open orders and inbound supply | Check units reported by the shift | Compare shift, resource and freeze rules across systems | Compare required and available minutes in the same shift and open the blocked operation |
| Quality and receipt | Reconcile receipts and stock | Read accepted and scrapped quantities | Test whether inspection release constrains receipt | Use a ten-unit order with eight released and check receipt and replacement quantities |
| Cost and close | Reconcile journals, open items and inventory | Inspect material and time entries | Reconcile cross-system references, reversals and retries | Reconcile finished goods, remaining WIP and scrap loss against the work order |
| Night-shift alerts | Locate the duty contact | Inspect the stop report | Trace event routing and acknowledgement | Test configured internal extensions and the acknowledgement trail |
| Data location and access | Check hosting and finance permissions | Check terminal access | Inspect both applications and integration credentials | Ask two roles about one record and verify their permitted scope on premises |
| Implementation effort | Prepare accounts and opening balances | Prepare operations, shifts and terminals | Rehearse interface retries, cutover and reconciliation | Bring opening stock and two open orders and reconcile with warehouse and finance |
On-premises deployment and cutover
- Choose a workflow
For a fan order, agree which records supply the due date, production date, released quantity and accounting cut-off.
- Size the installation
One reference machine runs a quantized 9B model with 16 GB of GPU memory and CPU offload. Connect tablets, scanners and IP phones over the factory LAN. List simultaneous users and voice channels. Run the candidate model at peak concurrency before selecting server memory, GPU and network capacity.
- Prepare opening data
Separate opening stock, unfulfilled sales and open purchase quantities. Identify fulfilled and cancelled amounts. Have warehouse and finance reconcile each batch to its original records.
- Rehearse with each role
Have each role use its own account. Rehearse a partial receipt or reversal, reconcile stock and ledger movements, then agree the cutover date.