Engineering & BOM

Which orders should use the revised fan motor?

Maintain item revisions, bills of materials, routings and work instructions. Release changes to production for readiness review.

Module film · Mandarin narration · Chinese and English captions

Twenty models share a board. How do you change the capacitor for just five?

  1. Trace direct usage

    Trace the capacitor to the board BOM, inspect affected parent models and select those approved to change.

  2. Separate non-interchangeable boards

    Give non-interchangeable boards distinct item codes. Review the revised BOMs and effective date on the engineering change.

  3. Replan and check material issues

    MRP calculates shortages separately by item code. Warehouse checks each issue against the materials frozen on the work order.

What to inspect in a demo

Follow the release package to its revision, change rationale and receiving status. Check an existing order against its original material basis.