Kitchen appliances · Mixed-model lines
Two models need the same station. Which shift can take a rush order?
Parts may be ready while equipment, staffing or a changeover still limits the line. The planner needs an available slot before revising the schedule.

Isolated workbench · verified 23 November 2026
A shift is 292 minutes short. Which order needs attention?
The plan needs 772 assembly minutes and has 480 available. The supervisor starts with the unbooked work order and checks it against the slot already reserved.
Blocked · no reservation
Open “本工序排程结果” (scheduling result). The frozen plan records insufficient equipment, shift time or qualified staff within the window. The planner checks which constraint can change.

Booked · 08:00–08:11
Open “本工序预约” (operation reservation). This order has an assembly slot on 24 November in the same plan. Check the existing booking before rescheduling.

What does the planner decide?
Decide which reservations to keep, verify equipment and crew availability, then decide whether to run a trial schedule and submit it for approval. A 292-minute capacity shortfall alone cannot establish a customer delivery date.
How the work moves
Check material readiness
Review shared parts, allocations and available stock against demand to find executable work orders.
Try a schedule by shift
Check equipment, staffing and existing reservations. Compare due-date priority with fewer changeovers among equally due jobs.
Ask AI, then review the plan
Inspect overload minutes and blocked operations in the plan. The planner reviews and submits it for approval before dispatch.